Teichert Construction has completed portions of the Cast in Place (CIP) facing walls that will ultimately provide the architectural facing along all the retaining walls on Vasco Rd. Upon completion of the soil nail installation and shotcrete facing walls, a CIP wall is then installed to create the final wall face and grades along the future road shoulder widening. A concrete barrier will be installed at the bottom of the wall, to "mirror" the future median barrier.
Wall 2 CIP forms and steel reinforcement.
"Fractured Fin" Finish at Wall 2.